Mingyang Smart Energy recently contracted TÜV NORD to certify the world’s most powerful offshore wind turbine, the MySE18.X-260.
The certification according to the internationally recognized standard IECRE OD501 covers the rotor-nacelle assembly (RNA). “With the new design, Mingyang is setting the benchmark on the international market for rated capacity and rotor diameter. We are looking forward to working with Mingyang on this ambitious project,” said Alexander Ohff, executive vice president Renewables at TÜV NORD.
The turbine, which is developed for international markets, is characterized by its high output of 18.X MW and a rotor diameter of 260 meters.
With the type certification, TÜV NORD is verifying the design and performance of the Mingyang turbine meets the demanding international standards and guidelines. This includes a detailed evaluation of the technical documentation, the analysis of the structural integrity and the mechanical systems, and the inspection of the electrical systems.
In addition, the safety aspects of the turbine are thoroughly checked. TÜV NORD inspects the manufacturing to evaluate whether the production of the main components and the final assembly of the hub and nacelle of the offshore wind turbine is in line with the design requirements and is ready for series production.
More info www.tuv-nord.com/en/tuv-nord-worldwide