Wind Systems Magazine

May 17, 2012

Share

RELATED ARTICLES

Concrete Proof: The Majestic Wind Farm

By using the Putzmeister Telebelt conveyor to transport...

 

CONSTRUCTION

When conducting site remediation, jet grouting is one...

 

CONSTRUCTION

Mass stabilization is a soil mixing technology for treating...

 

A Model for Offshore Innovation

As offshore development begins in the United States,...

 

CONSTRUCTION

No structure can remain standing without a solid...

 

CONSTRUCTION

Mass stabilization is a soil mixing technology for treating...

 

Fastening Technology for Tower Integrity

If you don’t pay attention to the small things, the big...

 

CONSTRUCTION

Performed properly, a mat foundation bearing on aggregate...

 

CONSTRUCTION

Used successfully on many types of structures, including...

 

CONSTRUCTION

A proven technique for stopping or reducing settlement,...

 

Innovative Turbine Foundation Solutions

The Rammed Aggregate Pier system, designed by the Geopier...

 

Providing Concrete Evidence

A new telescopic truck-mounted conveyor belt system from...

 

CONSTRUCTION

Both wind and weight create tremendous forces on tower...

 

CONSTRUCTION

Micropiles are versatile enough to function either as a new...

 

CONSTRUCTION

Soil mixing is an economical and efficient alternative to...

 

CONSTRUCTION

A proven technique for stopping or reducing settlement,...

 

CONSTRUCTION

A proven technique for stopping or reducing settlement,...

 

CONSTRUCTION

Consisting of concrete columns installed through weak...

 

CONSTRUCTION

A proven technique for stopping or reducing settlement,...

 

CONSTRUCTION

Densification of loose material prior to tower construction...

 

CONSTRUCTION

Performed properly, a mat foundation bearing on aggregate...

 

Modular Foundations for Small Wind

Innovative new foundations by Oldcastle Precast decrease...

 

CONSTRUCTION

Used successfully on many types of structures, including...

 

CONSTRUCTION

When performed properly, vibro compaction is an efficient...

 

Providing Concrete Evidence

A new telescopic truck-mounted conveyor belt system from...

 

CONSTRUCTION

A proven technique for correcting settlement, soil fracture...

 

CONSTRUCTION

Soil mixing is an economical and efficient alternative to...

 

CONSTRUCTION

Consisting of concrete columns installed through weak...

 

CONSTRUCTION

Soil mixing is an economical and efficient alternative to...

 

CONSTRUCTION

When performed properly, vibro compaction is an efficient...

 

CONSTRUCTION

Densification of loose material prior to tower construction...

 

CONSTRUCTION

Mass stabilization is a soil mixing technology for treating...

 

CONSTRUCTION

No structure can remain standing without a solid...

 

CONSTRUCTION

Both wind and weight create tremendous forces on tower...

 

Archives > April 2010 > CONSTRUCTION

CONSTRUCTION

By: James D. Hussin

 

Compaction grouting is the only soil improvement technique that can be used both pre-construction and beneath an in-place foundation.

 

When the site of a planned wind tower is underlain by sufficiently dense granular soils, a mat foundation can be designed to safely support the structure. If the soils are too loose they may provide insufficient bearing capacity, result in excessive static deformation, or undergo unacceptable performance during a seismic event (liquefaction or excessive dynamic settlement). If the loose conditions are discovered prior to construction, options include bypassing the loose soils with a deep foundation or improving the existing soil conditions. Pre-construction soil improvement techniques include vibro compaction, dynamic compaction, and compaction grouting. Of these techniques, compaction grouting is the only one that can be used both pre-construction and beneath an in-place foundation.

Compaction grouting involves injection of a mortar grout to displace and densify surrounding soil. The grout is very viscous (“low-mobility”) and primarily consists of Portland cement, sand, and water. An injection pipe is either drilled or driven to the bottom of the soils requiring densification. The grout is then pumped through the pipe as it is extracted in 1-3 foot stages. As the grout is pumped into each stage it displaces and densifies the surrounding soils. The injection holes are often sequenced in primary to secondary to tertiary locations, such that soil can be confined and effectively densified. This process can be performed to achieve significant improvement, which is fully verifiable with post-treatment field testing.



In order to prepare an effective grouting program, a geotechnical engineering consultant must develop a report containing site geological history, soil engineering properties (including density, gradation, and moisture content), and the in-situ permeability of each treatment stratum. Location and information about adjacent structures and utilities are also required.

For optimum compaction grouting results the vertical stress (overburden) on the treatment stratum must provide adequate confinement, such that the grout displaces the soil horizontally rather than vertically, so as not to cause surface movement (heave). Overburden stresses greater than 1,500 psf are typically required to maximize densification. However, densification can be achieved with less overburden pressure, but production and technical limitations may exist.

When compaction grout is injected into saturated soils, pore pressure will increase due to the added volume. This increased pressure must dissipate for effective densification to take place. Therefore, the grout injection rate should be slow enough to allow pore pressure dissipation. As weaker soil strata will undergo more densification, increased grout volume is often required in these layers. Hydro-collapsible soils can usually be treated effectively by adding water during drilling prior to compaction grout injection; in this case the soil is collapsed during drilling and densified by the subsequent grouting. Thinly stratified soils can cause difficult or reduced improvement capability as grout takes preferential paths during injection. Soils that lose strength during remolding—such as saturated, fine-grained soils and sensitive clays—should be avoided. Typical treatment spacing ranges between 6-10 feet. Based on hole spacing, the anticipated grouting volume per stage can be calculated. Often, a maximum injection pressure criterion is established to prevent fracture and ground heave. Vertical stages are usually set at 2-3 foot intervals, with tighter grid spacing generally leading to better results.
Quality control measures include: 1) procedural inspection and documentation of the work activity; 2) testing to ensure proper mix design; 3) monitoring of grout injection rates, volume, and pressure, and; 4) post-treatment verification of ground improvement. When applied properly, compaction grouting can provide the necessary improvement of granular soils for many wind turbine sites, allowing for a shallow foundation system. In most cases, mat foundations constructed on improved soil will provide an economic advantage over deep foundation options.  

 

 

About The Author
James D. Hussin

is a director for Hayward Baker, Inc., the leading specialty foundation and ground improvement contractor. He can be reached at jdhussin@haywardbaker.com. Go online to www.haywardbaker.com.

 

 

Wind Systems is a trademark of Media Solutions, Inc, copyright 2002-2010.

Wind Systems and all contents are properties of Media Solutions, Inc.