Wind Systems Magazine

May 17, 2012

Share

RELATED ARTICLES

Maintenance Profile: Eaton Corporation

From maintenance services, to turnkey substation...

 

Maximizing Wind Energy Yield

Wind farm operators want to make sure their turbines are...

 

Monitoring for Maintenance

The experts at Turningpoint explain why you can think of...

 

Brushing Up on Turbine Generator Maintenance

New designs and materials are leading to longer brush life...

 

MAINTENANCE

The worldwide growth of the wind industry, in addition to...

 

Thinking Outside the Gearbox

Even though gearbox design has improved over the years,...

 

The Future of Wind Turbine Diagnostics

As wind turbines increase in size, and their operating...

 

A Strategic Approach to Successful O&M

To maximize efficiency the need for a component repair or...

 

Increasing Productivity with Integrated Controls

Control solutions such as Rockwell Automation’s...

 

MAINTENANCE

The best way to avoid turbine downtime is to follow quality...

 

MAINTENANCE

Protecting turbine cables is vital, and at each maintenance...

 

MAINTENANCE

Remote monitoring allows Q&M professionals to check turbine...

 

Maximizing Wind Energy Yield

Wind farm operators want to make sure their turbines are...

 

Scaling the Heights Safely

Avanti Wind Systems is dedicated to designing and...

 

Company Profile: NRG Systems, Inc.

You can’t just talk the talk, you’ve got to walk it as...

 

Increasing Productivity with Integrated Controls

Control solutions such as Rockwell Automation’s...

 

Twisting in the Warranty Winds

Understanding and managing wind turbine warranty exposure...

 

Condition Based Turbine Maintenance

Whether it’s new or an existing installation,...

 

The Future of Wind Turbine Diagnostics

As wind turbines increase in size, and their operating...

 

Thinking Outside the Gearbox

Even though gearbox design has improved over the years,...

 

A Model for Offshore Innovation

As offshore development begins in the United States,...

 

MAINTENANCE

In order to increase reliability and service life, there...

 

Optical Ice Sensors for Wind Turbine Nacelles

New optical technology borrowed from the communications...

 

TECHNOLOGY

In addition to obvious siting factors such as location and...

 

Predictive Diagnostics for Increased Productivity

Predictive diagnostic software detects departures from...

 

TECHNOLOGY

Wind turbine blades are growing larger, so research must be...

 

TECHNOLOGY

Next-generation wind turbines will be smarter, more...

 

MAINTENANCE

Ideally, gearboxes would run forever with no downtime, but...

 

MAINTENANCE

By their very nature, most large-scale wind farms are...

 

Monitoring for Maintenance

The experts at Turningpoint explain why you can think of...

 

Twisting in the Warranty Winds

Understanding and managing wind turbine warranty exposure...

 

Increasing Uptime with Remote Monitoring

According to Schenck Balancing & Diagnostic Systems, the...

 

MAINTENANCE

Once your warranty period has drawn to a close, inadequate...

 

Archives > March 2010 > MAINTENANCE

MAINTENANCE

By: Merritt Brown

 

Pre-end of warranty inspections assess the service history of a project, vet out troubled turbines, and provide owners with an expectation for post-warranty costs.

 

By the end of 2010, for the first time in U.S. history more wind turbines will be operating out of warranty than will be covered. This trend will continue through the decade, causing maintenance and repair to become larger issues for project owners. Unscheduled maintenance costs that have degraded profits of turbine manufacturers during the warranty period will soon be shouldered by project owners, negatively affecting a wind company’s profitability. Unfortunately, actual warranty period service costs are relatively unknown to the project owner, and held closely by the original equipment manufacturer (OEM). With high repair costs and lost production on the line, putting the pieces together for a post-warranty maintenance program starts well before the warranty is over.

Since most OEMs would be unwilling to share their true warranty cost exposure, taking a stealth approach to obtaining this critical information is necessary. Generally speaking, project owners should conduct a pre-end of warranty due diligence inspection during the three to six month period before the warranty expires. This inspection may be the most important and valuable assessment made on behalf of the owner who will incur the ongoing operations and maintenance (O&M) costs following the coverage period. Even something as practical as a review of warranty service reports can provide a wealth of information, revealing historic parts usage, serial issues, labor requirements, and possibly even the cost basis for a post-warranty O&M budget.

With no additional business at risk a qualified Independent Service Provider (ISP) is the best option for balanced, impartial inspection results. Selection of an ISP should be made based on their experience in performing quality inspections for the specific turbine platform, something that will ensure the highest level of technical qualification and expertise. Areas that may be considered as standard for an end of warranty inspection include a quality assurance (QA) walk down using the turbine manufacturer’s checklists for mechanical completion, commissioning, and routine service QA. An OEM will typically provide these lists with the supplied turbine manuals, and they support the beginning of a thorough inspection that can help find issues that are common to a project or a turbine platform. An owner can expect the ISP to validate such items as bolt torque settings, component operation and wear, lubrication system integrity, and the reliability of installed safety equipment.

Though these OEM checklists will expose the obvious deficiencies of a turbine condition, a project owner would be wise to expand the end of warranty inspection to include oil and grease analysis (gear and bearing degradation), vibration monitoring (mechanical failure or alignment issues), borescope inspection of gearboxes, and infrared analysis of turbine and balance of plant electrical components. These inspections can be conducted simultaneously and offer information that can prove to be quite valuable in avoiding potential warranty claims and establishing a baseline for post-warranty maintenance.

Gearbox and generator rebuilds are the two most costly maintenance items for a wind project. Not only are the replacement parts expensive, but major expense is also associated with mobilizing the crane needed to repair these components. Simply failing to notice a single $1,000 bearing problem can lead to total repair costs exceeding $200,000 for a modern, multi-MW wind turbine. Added to lost production revenue, one post-warranty gearbox failure can account for as much as 10-15 percent of the price of the turbine. For these reasons owners should give top priority to gearbox inspections as part of the end of warranty walk down.

The purpose of a pre-end of warranty inspection is to assess the service history of a project, vet out troubled turbines, and provide the owner with an expectation for post-warranty costs. The inspection results will also confirm the quality of service being provided during the warranty period, and whether or not the turbines have been serviced properly and in accordance to the OEM’s obligations. In the next installment we will explore the common findings from an end of warranty inspection and how such information can build a strong preventative maintenance program during the post-warranty period.   

 

 

About The Author
Merritt Brown

is vice president for Rev1 Renewables, an energy services company supporting wind, solar, and biomass clients worldwide. To learn more call (866) 738-1669, or go online to www.rev1renewables.com.

 

 

Wind Systems is a trademark of Media Solutions, Inc, copyright 2002-2010.

Wind Systems and all contents are properties of Media Solutions, Inc.