Wind Systems Magazine

May 23, 2013

Share

RELATED ARTICLES

Advances in Remote Monitoring

The SKF WindCon turbine monitoring system provides...

 

CONSTRUCTION

Wind turbines may seem alike from a distance in terms of...

 

MAINTENANCE

The rise in mobile and wireless technology capability is...

 

MAINTENANCE

Reviewing the wind turbine theory of operation for better...

 

MAINTENANCE

If you see to the little things, the big things will take...

 

Optimal Tower and Foundation Design

A new measure of wind tower scalability for greater hub...

 

MAINTENANCE

In this conclusion of a two-part series, the author...

 

Uptower Tool Management

The last place you need to lose a tool is when you’re...

 

MAINTENANCE

Annual analyses of frequent turbine faults that cause...

 

Synthetics to Protect the Wind Turbine and the Environment

Fire prevention and biodegradability are important factors...

 

MAINTENANCE

Despite advances in detection of potentially catastrophic ...

 

Company Profile: NAES Corp.

Providing engineering, construction, turbine repair, and...

 

Q&A: Curtis Smith

Executive Vice President, Medcor, Inc.

 

MAINTENANCE

Whether it’s a broken bolt found on the deck or a...

 

Specialty Lubricants for Optimum Operation

As wind turbines grow more powerful, producing more energy,...

 

MAINTENANCE

The worldwide growth of the wind industry, in addition to...

 

Real-Time Monitoring Solutions

Vibration Specialty Corporation’s Protect Wireless system...

 

Lightning Detection for Turbine Protection

Whether you are planning a wind farm and assessing turbine...

 

Remote Condition Management

Not only does the CMaS system from Moventas gather critical...

 

Optical Ice Sensors for Wind Turbine Nacelles

New optical technology borrowed from the communications...

 

CONSTRUCTION

Anyone approaching a wind turbine under conditions where...

 

Q&A: John Boorman

Director of Sales/Availon, Inc.

 

MAINTENANCE

Once your warranty period has drawn to a close, inadequate...

 

Avoiding Shocks to the System

Wind towers are basically lightning rods, so the key to...

 

Predictive Diagnostics for Increased Productivity

Predictive diagnostic software detects departures from...

 

MAINTENANCE

Establishing your own post warranty preventative...

 

Wind is on the Rise

New coatings, foundation curing products and resins...

 

MAINTENANCE

In this conclusion of a two-part series, the author...

 

Q&A: Aaron Sage

Chief Operations Officer, Sage Oil Vac, Inc.

 

Remote-Controlled Tower Maintenance

Robotic climbing machines provide an alternative to...

 

Rotor Blade Leading Edge Erosion – Real Life Experiences

When leading edge erosion is not repaired or is repaired...

 

Taming the MRO Tiger

Qualtech Systems explains the benefits of leveraging...

 

MAINTENANCE

The generator is the heart of the windmill power generation...

 

Condition Based Turbine Maintenance

Whether it’s new or an existing installation,...

 

The Future of Wind Turbine Diagnostics

As wind turbines increase in size, and their operating...

 

Archives > January 2011 > MAINTENANCE

MAINTENANCE

By: Merritt Brown

 

Protecting turbine cables is vital, and at each maintenance interval sufficient time must be given to their care in order to avoid unnecessary—and expensive—downtime.

 

One of the most common findings from a wind turbine inspection is broken cable ties, which results in abrasion to cable insulation, and perhaps ultimately cable failure. These inexpensive nylon fasteners are used in nearly all wind turbines to secure power and control cables into proper position, and provide the necessary “wire management” of the structure. While their rather simplistic design makes them a likely choice for assembling a turbine cable system, fatigue, exposure to UV or extreme temperatures, and chemical degradation have a negative effect on their useful life. One broken cable tie can produce a very undesirable rub point for a critical cable, leaving the turbine at risk of looming downtime that may take weeks to recover from.

Placement Important
In wind turbine design, there is limited space available for electrical components. Cables pass through foundations, cabinets and panels, up and down the tower, through the nacelle, from the generator, and into and out of the hub. Assembling cables through these transition points requires design considerations that understand how the cable might be affected by the operational and vibration forces of the turbine. As the dynamic response of a wind turbine structure to the imposed loads affects the rotor, the power train, and the tower, where cables are placed is just as important to how they are fastened to the structure.

Failure of wind turbine cables falls into at least five categories that include insulation damage, corkscrew deformation, jacket abrasion, jacket swelling from oils or chemicals, and shielding loss due to breaks from continuous bending. Protecting turbine cables is vital, and at each maintenance interval sufficient time must be given to replacing broken cable ties, untwisting bundles, retightening pinch blocks, and installing cable protection along sharp edges of transition points. Common errors can be avoided through education and attention to detail. Unintentional assembly techniques are a prime cause of later failures, assembling groups of cables and inadvertently exposing an adjacent cable to the sharp ratchet end of a cable tie, for example. Another oversight lies with the installation of fiber optic cable within the turbine. Industry does not recommend the use of cable ties for securing fiber optic cables due to the common tendency toward over-zealous cinching, possibly compromising performance or in severe cases causing fiber breakage due to the high level of pressure exerted on the fiber. If cable ties must be used instead of the Velcro fasteners provided by a few manufacturers for this application, care should be given to cross-tying the fiber cable to the attached bundle.

Many of us have also seen the result of a cable twist counter that didn’t quite do its job. While yaw counters are typically reset upon finding excessively twisted cables, repeated occurrences are likely due to improper drip loop length that was established during construction. Ultimately leading to premature failure due to the corkscrew effect, this issue is easily recognized by deformation of the cable in this area and can only be mitigated by a controls change or reinstallation of the cable itself. During each inspection, verifying proper drip loop length is another simple maintenance activity that can increase the longevity of a turbine’s life.

Avoiding Downtime
Though cable ties are one of the least expensive options for securing wind turbine cables together, replacing a cable can be one of the more expensive repairs to make if it fails due to insulation damage. Recognizing the areas where cable failure is likely and taking precautions to limit damage is essential in order to minimize unexpected production downtime. Understanding the cable installation requirements also increases the likelihood that your O&M team will continue to use sound maintenance techniques that will save time and money later.  

 

 

About The Author
Merritt Brown

is vice president for Rev1 Renewables, an energy services company supporting wind, solar, and biomass clients worldwide. To learn more call (866) 738-1669, or go online to www.rev1renewables.com.

 

 

Wind Systems is a trademark of Media Solutions, Inc, copyright 2002-2010.

Wind Systems and all contents are properties of Media Solutions, Inc.