Wind Systems Magazine

May 23, 2013

Share

RELATED ARTICLES

LOGISTICS

Reporting straight from the jobsite, the author relates...

 

Construction Profile: Geopier Foundation Co.

Whether strengthening access roads or the soil beneath...

 

CONSTRUCTION

When conducting site remediation, jet grouting is one...

 

CONSTRUCTION

Production Tax Credit extension may lead to additional...

 

CONSTRUCTION

Consisting of concrete columns installed through weak...

 

Providing Concrete Evidence

A new telescopic truck-mounted conveyor belt system from...

 

CONSTRUCTION

Both wind and weight create tremendous forces on tower...

 

CONSTRUCTION

Identifying broken tiles usually calls for close...

 

CONSTRUCTION

Soil mixing is an economical and efficient alternative to...

 

CONSTRUCTION

Compaction grouting is the only soil improvement technique...

 

CONSTRUCTION

When the upper soil structure is too weak to support a wind...

 

CONSTRUCTION

When conducting site remediation, jet grouting is one...

 

TECHNOLOGY

Observation of metocean conditions is integral in...

 

Wind is on the Rise

New coatings, foundation curing products and resins...

 

Innovative Turbine Foundation Solutions

The Rammed Aggregate Pier system, designed by the Geopier...

 

CONSTRUCTION

There is both science and math at the core of all rigging...

 

CONSTRUCTION

Mass stabilization is a soil mixing technology for treating...

 

CONSTRUCTION

Both wind and weight create tremendous forces on tower...

 

CONSTRUCTION

When performed properly, vibro compaction is an efficient...

 

CONSTRUCTION

Micropiles are versatile enough to function either as a new...

 

CONSTRUCTION

A proven technique for correcting settlement, soil fracture...

 

LOGISTICS

In this installment we discuss the Seven Laws of Supply...

 

Making the Cut With HGG Profiling Machines

The Leica Absolute Tracker monitors cutting of wind turbine...

 

CONSTRUCTION

No structure can remain standing without a solid...

 

CONSTRUCTION

Crane business is booming in Texas and this company...

 

Construction Profile: Geopier Foundation Co.

Whether strengthening access roads or the soil beneath...

 

CONSTRUCTION

A proven technique for stopping or reducing settlement,...

 

CONSTRUCTION

Compaction grouting is the only soil improvement technique...

 

CONSTRUCTION

A proven technique for stopping or reducing settlement,...

 

Concrete Towers for Multi-Megawatt Turbines

The precast towers developed by Inneo Torres are suitable...

 

CONSTRUCTION

Soil mixing is an economical and efficient alternative to...

 

CONSTRUCTION

When the upper soil structure is too weak to support a wind...

 

CONSTRUCTION

When performed properly, vibro compaction is an efficient...

 

A Model for Offshore Innovation

As offshore development begins in the United States,...

 

CONSTRUCTION

A proven technique for stopping or reducing settlement,...

 

Archives > December 2010 > CONSTRUCTION

CONSTRUCTION

By: Mike Smith, PE

 

Used successfully on many types of structures, including high-rise buildings and nuclear power plants, augered piles are ideally suited for use in wind tower applications.

 

Auger cast piles (augered or displacement)—also known as augered piles, augered cast in place (ACIP) piles, or continuous flight auger (CFA) piles—are a cost-effective deep foundation system that can be tailored to most soil, groundwater, and loading conditions.

The piles are normally installed using a crane with free-hanging leads, but can also be installed using low-headroom equipment for retrofitting existing structures. The augered piles are constructed by drilling to the required depth in one continuous process utilizing a hollow-stem, continuous-flight auger. Once the auger has reached the required depth, a high-strength sand/cement grout is pumped through the auger to the base of the auger in order to establish a pressure head of grout. After the pressure head of grout is established the auger is continuously withdrawn as the grout is pumped, ensuring the stability of the hole by maintaining the required pressure head of grout. Following the completion of the grouting and the withdrawal of the auger, the reinforcing steel is immediately placed into the fluid grout. The reinforcing steel consists of reinforcing bars or high-strength reinforcing bars (60 ksi, 75 ksi, or 150 ksi) installed either as single bars or tied in a cage that can be installed the full length of the pile, or in only the upper portion of the pile.

Augered piles are typically installed around the perimeter of tower foundations and are incorporated into a concrete pile cap. The piles are installed in diameters ranging from 12 inches to 36 inches and depths of up to 155 feet. Compressive capacities vary from 50 tons for smaller diameter piles to over 1,200 tons for the larger diameter piles with tension capacities typically 50-75 percent of the compression capacity. The larger diameter piles are generally used when it is necessary to resist high lateral load applications. Since augered piles develop a significant portion of their capacity through friction, they are able to develop a high-tension capacity as well as a high compression capacity, which makes them ideal for tower applications.















Augered piles offer several advantages over driven piles. Since the piles are cast in place, there are no splices required, minimal noise and vibrations during installation, and they can be installed to the exact depth without protruding pile butts. Due to an increase in the interaction between the piles and the surrounding soils, the augered piles also offer the advantage of increased capacities over comparable driven piles. Depending on the subsurface conditions, the augered piles can be more cost-effective and quicker to install than drilled shafts of similar capacity since augered piles are installed in a single continuous process versus the multiple passes required with the drilled shaft installation.


The design of the piles is performed by a qualified geotechnical engineer or design-build team and is verified by performing full-scale compression, tension, and/or lateral load testing. The pile installation is monitored by a full-time inspector who verifies that the piles are installed to the design depth and that the proper grout volume for each pile is used. Samples of the grout are also tested to verify that it achieves the required unconfined compressive strength.

Recent advances in automated measuring equipment allow for the reliable monitoring of pile installation real-time. Sensors installed on the drill rig monitors depth, grout volumes, pump pressure, hydraulic pressure, and other important parameters. These sensors can be monitored by the operator and inspectors on site, and also remotely through connection to a designated FTP site. This monitoring equipment can help identify any issues during the pile installation process.

Augered piles have been used successfully on many types of structures including high-rise buildings, nuclear power plants, solar power plants, and refineries. Due to their ability to economically develop high compression and tension capacities they are ideally suited for use on wind tower applications.

 

 

About The Author
Mike Smith, PE

 is a project manager with HJ Foundation, a subsidiary of Hayward Baker Inc, the leading specialty foundation and ground improvement contractor. Go online to www.hjfoundation.com and www.haywardbaker.com.

 

 

Wind Systems is a trademark of Media Solutions, Inc, copyright 2002-2010.

Wind Systems and all contents are properties of Media Solutions, Inc.