Wind Systems Magazine

May 17, 2012

Share

RELATED ARTICLES

CONSTRUCTION

Used successfully on many types of structures, including...

 

CONSTRUCTION

Mass stabilization is a soil mixing technology for treating...

 

CONSTRUCTION

When conducting site remediation, jet grouting is one...

 

CONSTRUCTION

Soil mixing is an economical and efficient alternative to...

 

CONSTRUCTION

When performed properly, vibro compaction is an efficient...

 

Vibration-Based Wind Tower Foundation Design

Wind towers must sustain continuous vibration-induced...

 

CONSTRUCTION

Performed properly, a mat foundation bearing on aggregate...

 

Concrete Proof: The Majestic Wind Farm

By using the Putzmeister Telebelt conveyor to transport...

 

CONSTRUCTION

Both wind and weight create tremendous forces on tower...

 

CONSTRUCTION

When the upper soil structure is too weak to support a wind...

 

Providing Concrete Evidence

A new telescopic truck-mounted conveyor belt system from...

 

CONSTRUCTION

Performed properly, a mat foundation bearing on aggregate...

 

CONSTRUCTION

A proven technique for stopping or reducing settlement,...

 

Providing Concrete Evidence

A new telescopic truck-mounted conveyor belt system from...

 

CONSTRUCTION

When conducting site remediation, jet grouting is one...

 

CONSTRUCTION

Densification of loose material prior to tower construction...

 

Construction Profile: Geopier Foundation Co.

Whether strengthening access roads or the soil beneath...

 

CONSTRUCTION

Used successfully on many types of structures, including...

 

Vibration-Based Wind Tower Foundation Design

Wind towers must sustain continuous vibration-induced...

 

Modular Foundations for Small Wind

Innovative new foundations by Oldcastle Precast decrease...

 

CONSTRUCTION

Used successfully on many types of structures, including...

 

CONSTRUCTION

Micropiles are versatile enough to function either as a new...

 

CONSTRUCTION

A proven technique for stopping or reducing settlement,...

 

Vibration-Based Wind Tower Foundation Design

Wind towers must sustain continuous vibration-induced...

 

CONSTRUCTION

A proven technique for stopping or reducing settlement,...

 

CONSTRUCTION

Both wind and weight create tremendous forces on tower...

 

Innovative Turbine Foundation Solutions

The Rammed Aggregate Pier system, designed by the Geopier...

 

CONSTRUCTION

When performed properly, vibro compaction is an efficient...

 

CONSTRUCTION

Densification of loose material prior to tower construction...

 

CONSTRUCTION

Compaction grouting is the only soil improvement technique...

 

CONSTRUCTION

No structure can remain standing without a solid...

 

CONSTRUCTION

Mass stabilization is a soil mixing technology for treating...

 

Archives > July 2010 > CONSTRUCTION

CONSTRUCTION

By: Eric Drooff

 

A proven technique for correcting settlement, soil fracture grouting is a cost-efficient alternative to complete reconstruction of the foundation.

 

Wind towers founded on spread footings may occasionally settle as a result of incomplete soils information or inadequate subgrade preparation. When excessive total or differential settlement occurs to wind towers founded on fine-grained soils, soil fracture grouting may be the correct solution for releveling and providing long-term support. For foundation applications, soil fracture grouting is most commonly used as a remedial measure to counteract ongoing consolidation settlement in fine-grained soils, or for the pretreatment of marginally stiff, fine-grained soils that might otherwise require the use of deep foundations.

Soil fracture grouting—also known as compensation grouting, or soilfrac—is the locally confined and controlled fracturing of the ground with neat fluid grout at pressures in excess of the hydro-fracture pressure. The bearing capacity and shear resistance of the in situ soils is increased, and heave is induced to counterbalance settlement. The technique can be selectively controlled to produce deflection of varying amounts at specific locations. Soil fracture grouting has generally found a commercial niche in its application in fine-grained soils where permeation and jet grouting are not possible. Ground improvement via soil fracture grouting is based on three mechanisms:

1) The soil unit, or skeleton, is reinforced by a series of hard grout lenses which propagate out from the injection point to form a matrix of hard grout and soil;
2) The fluid grout finds and fills voids and causes some compaction in more coarse grained soil along the grout lenses;
3) The plasticity index of saturated clays decreases through the exchange of calcium ions originating from cement or other fillers.

Soil fracture grouting uses injection pipes known as Tube-a-manchette (TAM) pipes to deliver the grout. TAM pipes are typically 2-inch diameter steel pipes with injection ports every few feet along the length of the pipe.
Rubber sleeves (manchettes) cover each injection port and serve as one-way valves that open during injection and collapse onto the ports after injection. The TAM pipes are installed in boreholes in a designed pattern beneath a foundation to allow injection over the entire foundation area. Depending on site access, TAM pipe inclinations can range from vertical to horizontal to create a treatment zone. Once the TAM pipes have been inserted into the borehole, the space between the TAM pipe and borehole wall (annulus) is filled with a weak but stiff grout that seals and stabilizes the borehole and holds the TAM pipe in position. A pneumatic packer is then pushed into the TAM to a specified injection point. Rubber seals at each end of the packer are hydraulically inflated to isolate the injection port. The initial pressure of the fracture grout breaks through the annulus, permitting it access to the soil. Once the hydro-fracture pressure of the soil is exceeded, fractures open up in the soil and are immediately widened by the subsequent grout.  

 

Once the target grout zone has been reinforced and the structure has been releveled, monitoring must continue to assess long-term stability. TAM pipes can remain in the ground beneath the foundation for many years, allowing for repeated injections to further relevel and stabilize long-term movements created by secondary consolidation.


An effective quality control program requires that all stages be monitored and fully documented. Automated, real-time monitoring of structural movement is accomplished with water level systems or electro levels during injection to verify the effectiveness of the work. Grout mix, injection pressure, volume, and pump rate are also carefully designed based on the ground conditions, and monitored to help to ensure effective production work.
 

For more than 25 years soil fracture grouting has been used to lift and relevel foundations of structures including bridge piers, electrical equipment pads, and high- and low-rise buildings throughout Europe and North America. Wind tower construction can take advantage of this effective, cost-efficient alternative to complete reconstruction of the foundation system.  

 

 

About The Author
Eric Drooff

 is a senior vice president for Hayward Baker, Inc., the leading specialty foundation and ground improvement contractor. He can be reached at erdrooff@haywardbaker.com. Go online to www.haywardbaker.com.

 

 

Wind Systems is a trademark of Media Solutions, Inc, copyright 2002-2010.

Wind Systems and all contents are properties of Media Solutions, Inc.